Take Control
Control Charts: Which One Should I Use? Part II

Control Charts: Which One Should I Use? Part II

By Steve Wise
July 21st, 2011

Selecting the right control chart starts by knowing something about what you want the chart to say about the process – what questions do you want the chart answer? Another way to look at this is ask yourself, “Why am I collecting data on this part?” The answers to these questions will provide necessary information to determine the sampling strategy, sample size and any special needs that would require implementing special processing options that extend the function of traditional charts. This post will address sample size, target charting and multiple process streams with variables data. There are other considerations and data types that will be discussed in future posts. 

Sample Size

The sample size is the number of measurement values, for a given test feature, to be gathered to represent a single “snapshot of time.” For example, if weights are taken from three consecutive filled bottles every 30 minutes, the sample size is three and the sampling interval is 30 minutes. The sample size does not represent the number of plot points on a chart. The common symbol used for sample size is n. There are three sample size considerations:

  1. sample sizes of 1 (n=1)
  2. sample sizes between 2 and 9 (2 ≤ n ≤ 9)
  3. sample sizes of 10 or larger (n ≥ 10)

When sample sizes are 1, the IX-MR (individual X and moving range) chart is used. For sample sizes of 2 through 9, the Xbar-Range chart is used. For sample sizes of 10 or greater, the Xbar-Sigma chart is used. These are the three core variables control charts. Most all other variables charting techniques are rooted in one of these three core charts.

control chart example

 

Number of Process Streams

A process stream is characterized, using InfinityQS terminology, with Part, Process and Test.  A single process stream generally represents a series of plot points from one part, one process and one test. For example, 50ml bottle weight from fill nozzle A would be one process stream; 50ml bottle weights from fill nozzle B would be another process stream. Because fill nozzle A could have a unique statistical personality than fill nozzle B, one would be ill advised to combine (confound) the data from both nozzles in a single subgroup. The better sampling strategy would be to treat the data from each fill nozzle as separate streams of data. When challenged with a process that generates multiple process streams one has the option of using one control chart for each process stream or use a specialized chart that allows all process streams to co-exist on the same chart. Charts for multiple process streams are called Group charts. 

control chart sample size

Same Feature, but Different Targets

Processes are commonly used to produce different products. In many cases a product change-over means changing process set points in order to produce the different product. Continuing with the fill nozzle, when the line changes from a 50ml bottle to a 100ml bottle, the same nozzles are used, but are programmed to fill to 100ml. When one wants to monitor a process’ ability to hold a set point, regardless of the product, the data can be combined across multiple set points by simply subtracting the set point from the actual output result. A fill of 100.3 would be represented on the chart as 0.3. By taking out the target values, a single chart can be used to monitor, in time-order, a process’ ability to hold a set point regardless of the spec of the product being produced at the time. These types of charts are called Target charts. As long as the combined products share similar variation, multiple parts can be represented on the same chart. Target charts are especially useful in short production run environments.

control chart decision tree

Control charts are designed for specific purposes. They are real-time graphical tools meant to identify when a process has changed or something unusual has occurred. There are 100’s of different types of charts, but they are all rooted in the seven original control charts developed by Walter Shewhart in 1928. Items to consider to help select the right chart for the job are sample size, the need to combine more than one process stream on the same chart and whether there will be tests with different target values on the same chart. The three chart families we addressed were traditional charts, group charts and target charts. Additional chart types will be discussed in future blogs. 

If you haven't already be sure to check out Control Charts: Which One Should I Use? Part I.

Categories »
The content of this field is kept private and will not be shown publicly.

Take Control

Prevent problems before they occur, ensure quality and increase productivity.

Launch Product Demo
 
 

Webinars

Attend a live Webinar with one of our experts for best practices in real-time quality control.

View Webinars

© Copyright 2014 InfinityQS